Projects

Completed, in progress and currently tendering. Contract values and tender references are not published.

28completed projects listed
11in progress or awarded
16tenders and proposals open, October 2026
3countries of project sites: UAE, Yemen, Somalia
Flagship projects

Featured work

Images are from DIS and DOME Group sites and show the type of work described. Projects marked as DOME Group contracts are held by a group company and delivered by the DIS team.

DEWA
In progressDOME Group contract

Gas compressor PLC and HMI upgrade, K-Station

Dubai Electricity and Water Authority (DEWA) / Jebel Ali, UAE / 2026

Obsolete GE-Fanuc 90-30 PLCs and HMIs on three natural gas compressor trains replaced with redundant Emerson PACSystems RX3i controllers, Profinet remote I/O and Cimplicity HMIs. The link to the plant DCS is kept, field wiring is reused and each train is cut over separately. Emerson is the technology partner.

ADNOC Distribution
In progressDOME Group contract

Aviation fuel management system

ADNOC Distribution / UAE airports / 2026-2029

IoT and software system for aviation fuel operations at several UAE airports: vehicle telematics, ATEX-rated in-cab tablets, back-office servers, integration with business and flight information systems, and AI-assisted dispatch. Pilot, roll-out, 24/7 support and multi-year maintenance.

45 MW HFO power plant: complete E, I & C and DCS
Awarded

45 MW HFO power plant: complete E, I & C and DCS

SABSON for BECO / Somalia / 2026

More than 40 control and electrical panels and enclosures, SCADA and DCS on Siemens S7-1500R: the control brain of the whole plant, from the engine and auxiliary panels to the central control room.

DCS migration from Foxboro I/A to Rockwell PlantPAx
In progress

DCS migration from Foxboro I/A to Rockwell PlantPAx

SAFER (SEPOC) / Marib, Yemen / 2024-2026

Migration of the top and second layers of a Foxboro I/A DCS to Rockwell PlantPAx for a gas processing plant and its compressors: new architecture and control strategies, logic and HMI conversion, test procedures and a staged cutover plan.

Two power plants, TCF and camp: SCADA and power management
Completed

Two power plants, TCF and camp: SCADA and power management

ADNOC / Tecnimont / Hail and Ghasha development, UAE / 2024-2025

Turnkey SCADA and power management for the TCF power plant and for the construction camp's hybrid solar and generator plant. Engineering, panels, integration, commissioning and start-up.

40 MW hybrid solar plant: SCADA, CCTV, communications and electrical works
In progress

40 MW hybrid solar plant: SCADA, CCTV, communications and electrical works

ATGC / GSU / Mocha, Yemen / 2025-2026

Turnkey SCADA and power management, a complete CCTV and communication system, and site installation and pre-commissioning of the MV, LV and control systems.

Refinery control system upgrade
In progress

Refinery control system upgrade

Marib Refinery / Marib, Yemen / 2024-2025

Replacement of obsolete workstations, software and network upgrades, integration with field devices, testing, commissioning, documentation and technical support.

Two power plants interconnected: SICAM power management
Completed

Two power plants interconnected: SICAM power management

SEPOC / Block 18, Yemen / 2021-2022

Three Rolls-Royce Avon 16 MW gas turbines interconnected with three Solar Turbines 4 MW units, with synchronisation, power management and load management.

120 MWp solar plant: MV cable terminations
Completed

120 MWp solar plant: MV cable terminations

Masdar / EMC / Aden, Yemen / 2024

Skilled electrical crews for the termination of 36 kV and 1.9/3.3 kV power cables at the plant substations.

Project register

Every project, filterable

Electrical, instrumentation and control execution, power management systems and engineering studies since 2011, plus the tenders we are pricing now. Tenders are not awarded work.

Project and client
Location
Year
Platform or stage
Status
Gas compressor PLC and HMI upgrade, K-StationDubai Electricity and Water Authority (DEWA) / DOME Group contract

Obsolete GE-Fanuc 90-30 PLCs and HMIs on three natural gas compressor trains replaced with redundant Emerson PACSystems RX3i controllers, Profinet remote I/O and Cimplicity HMIs. The link to the plant DCS is kept, field wiring is reused and each train is cut over separately. Emerson is the technology partner.

Jebel Ali, UAE
2026
Emerson PACSystems RX3i, Profinet, Cimplicity
In progress
Aviation fuel management systemADNOC Distribution / DOME Group contract

IoT and software system for aviation fuel operations at several UAE airports: vehicle telematics, ATEX-rated in-cab tablets, back-office servers, integration with business and flight information systems, and AI-assisted dispatch. Pilot, roll-out, 24/7 support and multi-year maintenance.

UAE airports
2026-2029
IoT telematics, ATEX tablets, AI dispatch
In progress
On-grid PMS: 2.2 MWp PV, 1.5 MW battery and three gensetsDome Advanced Electromechanical Works

Power management for a hybrid site with a 2.2 MWp solar plant, 1.5 MW battery storage and three 800 kVA generators.

UAE
2026
DEIF AGC-150, Allen-Bradley ControlLogix
In progress
Alraja gas plant synchronisation and PMSSEPOC

Three CAT 1.2 MW gas engines with a Solar Turbines C-20 gas turbine.

Block 18, Yemen
2026
DEIF AGC-150, ControlLogix
In progress
40 MW hybrid solar plant: SCADA, CCTV, communications and electrical worksATGC / GSU

Turnkey SCADA and power management, a complete CCTV and communication system, and site installation and pre-commissioning of the MV, LV and control systems.

Mocha, Yemen
2025-2026
Siemens S7 and WinCC
In progress
DCS migration from Foxboro I/A to Rockwell PlantPAxSAFER (SEPOC)

Migration of the top and second layers of a Foxboro I/A DCS to Rockwell PlantPAx for a gas processing plant and its compressors: new architecture and control strategies, logic and HMI conversion, test procedures and a staged cutover plan.

Marib, Yemen
2024-2026
Rockwell PlantPAx, ControlLogix, FactoryTalk View SE
In progress
Refinery control system upgradeMarib Refinery

Replacement of obsolete workstations, software and network upgrades, integration with field devices, testing, commissioning, documentation and technical support.

Marib, Yemen
2024-2025
Workstations, network, field integration
In progress
Solar plant with battery storage: SCADAUTICO / Yellow Door Energy

Turnkey SCADA for a solar plant with battery storage, covering trackers, weather stations, gensets and synchronisation.

UAE
2024-2025
Plant SCADA, trackers, weather stations
In progress
Brume LPG storage tanks: electrical and I&C engineeringYemen Gas Company

Detailed electrical and I&C engineering package with calculations and drawings, capital cost estimate and budget.

Mukalla, Yemen
2024
In progress
Ship offloading and truck loading station: detailed engineeringYemen Petroleum Company

Complete construction-ready engineering: process, mechanical, piping, I&C, electrical and civil/structural.

Yemen
2024
In progress
45 MW HFO power plant: complete E, I & C and DCSSABSON for BECO

More than 40 control and electrical panels and enclosures, SCADA and DCS on Siemens S7-1500R: the control brain of the whole plant, from the engine and auxiliary panels to the central control room.

Somalia
2026
Siemens S7-1500R, WinCC
Awarded
Two power plants, TCF and camp: SCADA and power managementADNOC / Tecnimont

Turnkey SCADA and power management for the TCF power plant and for the construction camp's hybrid solar and generator plant. Engineering, panels, integration, commissioning and start-up.

Hail and Ghasha development, UAE
2024-2025
Emerson PLC and SCADA
Completed
120 MWp solar plant: MV cable terminationsMasdar / EMC

Skilled electrical crews for the termination of 36 kV and 1.9/3.3 kV power cables at the plant substations.

Aden, Yemen
2024
36 kV and 1.9/3.3 kV
Completed
120 Barton chart recorders converted to PLC flow calculationSEPOC

Readings that used to be calculated by hand from paper charts are now computed and logged by the control system.

Yemen
2024
PLC flow calculation
Completed
RTG crane drive and control migrationAden Ports

Rubber-tyred gantry crane drive and control system migration.

Aden, Yemen
2024
Drives and control system
Completed
CPU production expansion train: control panel upgradeSAFER

System architecture and specifications, control logic and HMI design, configuration files, procedures and approvals.

Yemen
2024
Completed
Gas turbine control panel upgrade, FT100 to FT125SEPOC

Installation, pre-commissioning, commissioning and start-up.

Yemen
2023
FT125
Completed
FEED for a 75 MW gas turbine plantIngenuity for PetroMasila

Electrical and automation FEED for the Block 10 plant upgrade.

Block 10, Yemen
2023
Completed
Trunkline pipeline control systemGriffin

Design, engineering, procurement, commissioning and start-up of the trunkline control system.

Yemen
2022
Completed
EPF1, EPF2 and EPF3: synchronisation and PMS with the grid, eight diesel enginesOMV
Block S1, Yemen
2022
DEIF AGC-150
Completed
Fuel gas supply pipeline: electrical and I&C engineeringPublic Electricity Corporation
Yemen
2022
Completed
Two power plants interconnected: SICAM power managementSEPOC

Three Rolls-Royce Avon 16 MW gas turbines interconnected with three Solar Turbines 4 MW units, with synchronisation, power management and load management.

Block 18, Yemen
2021-2022
Siemens SICAM 8000, Allen-Bradley ControlLogix
Completed
Power generation MCC fire detection and FM-200 suppressionOMV

Design, engineering, procurement, commissioning and start-up of MCC fire detection and gas suppression.

Block S1, Yemen
2021
FM-200
Completed
Trunkline control system: integrated SCADA designOMV
Yemen
2021
Completed
CPF power: synchronisation, PMS and load managementOMV

Four Rolls-Royce gas engines of 5.8 MW each.

Block S1, Yemen
2020-2022
DEIF AGC-3, Siemens S7-400
Completed
Gas engine control migrationBajel

Upgrade of the gas engine control system from Schneider Modicon to Allen-Bradley ControlLogix.

Yemen
2020
Modicon to Allen-Bradley ControlLogix
Completed
Tank monitoring systemYICOM

Design, engineering, procurement, commissioning and start-up of tank gauging on Endress+Hauser.

Yemen
2020
Endress+Hauser radar gauging
Completed
KPU to CPU gas reinjection pipeline: detailed engineeringSAFER
Yemen
2020
Completed
256 MW power plant: engineering review with TATA Consulting EngineersPESCO
Yemen
2020
Completed
264 MW power plant: installation to performance testPESCO

Installation, pre-commissioning, commissioning and start-up of two GE units and all balance of plant (fire system, PAGA, water and crude oil treatment), through the performance test.

Aden, Yemen
2019
GE Frame 9E
Completed
Frame 5C and 5D overhaul, Mark IV to Mark VIe upgradeSEPOC

Overhaul of GE Frame 5C and 5D gas turbines and control upgrade from Mark IV to Mark VIe.

Yemen
2019
GE Mark VIe
Completed
Block S1: synchronisation and power sharing, GE gas engine with CAT dieselsOMV
Block S1, Yemen
2019
DeepSea
Completed
Block 18 CPU: power sharing for three Solar Turbines C-50 gas turbinesSEPOC
Block 18, Yemen
2019
Allen-Bradley CGCM 1407
Completed
Diverting CPU-II to RGC gas pipeline: detailed engineeringSAFER
Yemen
2019
Completed
Synchronisation and power sharing, three 1.5 MW diesel enginesWater Authority, Aden
Aden, Yemen
2017
DeepSea
Completed
Naser well field: synchronisation and PMS, three generatorsWater Authority, Aden
Aden, Yemen
2013
easYgen 3200
Completed
Synchronisation and PMS: MHI 1.5 MW with two Cummins 400 kWAden Airport
Aden, Yemen
2012
easYgen 3200
Completed
Ahmed well field: synchronisation and PMS, five generatorsWater Authority, Aden
Aden, Yemen
2012
easYgen 3200
Completed
Block 43 CPF: synchronisation and power sharing, CAT diesel with Waukesha gas enginesDNO
Block 43, Yemen
2011
easYgen 3200
Completed
RTU replacement at 13 substationsDubai power and water utility
Dubai, UAE
2026
Stage: Tender
Tendering
Emergency diesel generator control panel retrofit: PLC, AVR, synchroniser, protection and HMIDubai power and water utility
Dubai, UAE
2026
Stage: Tender
Tendering
DC/DC converter panels for re-poweringDubai power and water utility
Jebel Ali, UAE
2026
Stage: Tender
Tendering
Power station Siemens PCS 7 DCS upgrade with cybersecurityUAE federal power and water utility
Northern Emirates, UAE
2026
Stage: Budget proposal
Tendering
Main station online condition monitoring with a digital twinUAE federal power and water utility
Northern Emirates, UAE
2026
Stage: Bid submitted
Tendering
LiDAR wind monitoring: power, fibre and SCADA integrationSolar park developer's contractor
Dubai, UAE
2026
Stage: Proposal
Tendering
Smart storm-water network: radar sensors, RTUs, NB-IoT and AI analyticsAbu Dhabi government authority
Abu Dhabi, UAE
2026
Stage: Bid submitted
Tendering
Water quality monitoring system with IoT sensors and data platformAbu Dhabi government authority
Abu Dhabi, UAE
2026
Stage: Tender
Tendering
Perimeter monitoring for a protected breeding site: fibre sensing, radar and CCTVAbu Dhabi government agency
Abu Dhabi, UAE
2026
Stage: Tender
Tendering
Fuel and energy management automation for rig sites: IoT, OPC UA and cloud platformNational drilling company, UAE
UAE
2026
Stage: Post-tender clarification
Tendering
Security systems phase 2: CCTV, access control, network and cybersecurity at 238 sitesAbu Dhabi water services company
Abu Dhabi, UAE
2026
Stage: Bid submitted
Tendering
Plant OT virtualisation, Level 3 and 3.5 serversUAE petrochemical producer
Ruwais, UAE
2026
Stage: Expression of interest
Tendering
DRP electrical works, Yokogawa ESD, oxygen analysers, level transmitters and crane drivesUAE steel producer
Abu Dhabi, UAE
2026
Stage: Proposals
Tendering
Building monitoring system: Micro870 PLC, FactoryTalk Optix HMI and power metersEngineering contractor, UAE
Abu Dhabi, UAE
2026
Stage: Proposal
Tendering
Solar PV with battery storage for two island sites, 122 kWp and 248 kWpEngineering contractor, UAE
Abu Dhabi, UAE
2026
Stage: Proposal
Tendering
Solar borehole pumping for 28 wells with remote monitoringAbu Dhabi well fields operator
Abu Dhabi, UAE
2026
Stage: Proposal
Tendering

Have a similar plant?

Ask us for references for your platform or industry. We can share contacts on request.